Ing. Tomáš Rau
Martin Herodes
AOPK ČK (POPFK)
Lesy České republiky s.p.
2023
339 715,10 Kč without DPH
marketa.blovska@lesycr.cz
There was a non-functional historical reservoir on the stream that became overgrown in the past and had a broken dam in two places. As part of a project of the Lesy ČR (Forests of the Czech Republic) - Stream Administration, the former reservoir area was used to create a flow-through pool and 7 non-flowing pools with some below the dam, with a total area of 1,400 m2. The remains of the dam body were used during the construction. A stone slide with three stabilizing double plank barriers was built in the notch dug in the dam, which will allow a safe flow of the water stream over the dam body. The first barrier determines the water level in the pool, the second and third stabilize the stone path that forms the slide. Between the rows of planks of each barrier, a geotextile is inserted vertically and then continuing horizontally under the adjacent reinforcement of the chute to prevent erosion. The restoration of water features enhanced water retention and created new biotopes that help increase biodiversity.